Define the cleaning phase
A project may need an agreed tidy during works, a detailed clean after trades finish, or a final clean before presentation — and these terms vary between projects and contracts. Confirm timing, scope and responsibility in the project arrangements rather than assuming one standard package covers all three.
The phase decides the scope more than the size does: a clean booked too early just gets re-soiled by the next trade.
Prepare the area for access
The builder or site contact should confirm work is complete in the area, access is permitted and safe, and utilities are available if required. Remove tools, offcuts and construction waste through the responsible project team, and keep the work area clear of active trades and hazards.
A property that's still being worked on isn't a cleaning job — it's a construction site, and booking a clean into it just wastes the visit.

Specify suitable cleaning tasks
List floors, joinery, fixtures, interior glass and agreed debris, and be explicit that repairs, painting, demolition, defect rectification and hazardous-material removal are not ordinary cleaning tasks. A construction clean is a finishing service, and its scope should be written down and agreed before anyone starts.
The more specific the task list, the more accurate and comparable the quote.
Refer hazards and trade work
Suspected asbestos, silica dust, chemical residue or other hazardous materials require qualified assessment and handling — a routine cleaner has no business touching them. Repairs, sanding, repainting, re-grouting and hardened cement or paint are trade work, not cleaning.
Keeping those boundaries clear protects both the clean and the builder's responsibilities, and prevents a cleaning job being blamed for defects it was never meant to fix.