Break the project into cleaning stages
Identify whether the site needs a post-trade pass, detailed dust removal or final presentation before handover. List rooms, floors, joinery, fixtures and interior glass. Multiple visits may be needed when trades return or dust-producing work continues; timing should be agreed against the project programme.

Manage dust and surface residue
Describe construction dust, adhesive, grout haze, paint or silicone residue and the materials affected. Methods must suit finished surfaces and manufacturer instructions. Cleaning does not remove defects, restore damaged finishes or guarantee every mark can be removed.
Confirm safe access and waste responsibility
Provide site contact, utilities, cured finishes, remaining trades, access route, lift/loading rules and areas cleared for entry. Agree who supplies bins and handles disposal of non-hazardous debris. Asbestos, chemicals, sharps and contaminated waste require an appropriate specialist and are not routine cleaning.
Prepare a useful project quote
Share project type, stage, room list or floor area, handover date, dust/residue, access and trade schedule. Photos or a site walkthrough can clarify scope. Confirm inclusions, exclusions, sequence and waste arrangements in writing.