Confirm the site is ready
Ask the builder or site manager to confirm trades have finished in the areas to be cleaned, utilities and access are available, and the work zone has been released. Clarify who removes offcuts, sharp debris, leftover products and construction waste before cleaners attend.

Set a realistic cleaning scope
List rooms, accessible surfaces, floors, joinery, fixtures and reachable glass. Identify dust, residue, paint or adhesive marks for assessment rather than assuming every spot can be removed safely. Cleaning methods depend on surface finish, cure time, manufacturer instructions and condition.
Keep specialist hazards separate
Do not ask routine cleaners to handle suspected asbestos, silica-containing dust, chemical spills, exposed wiring, unstable structures, sharp building waste or other hazardous material. Stop and refer concerns to the builder or an appropriately qualified specialist. Do not dry-sweep or disturb suspected hazardous dust.
Compare quotes and coordinate access
Share property type, size, work completed, photos, access, remaining trades and required timing. Confirm inclusions, exclusions, equipment, waste responsibilities and how variations are approved. Schedule cleaning after dusty trades and before furnishings arrive where practical.